A simple report that shows Revenue and Costs By Jobs,
Company | BKH |
Job Title / Role | Accountant |
I need it... | 6 months |
Dear Viewpoint Suggestion Box contributor;
We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs.
Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.
© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.
No worries, I'll let the case run through but not the sum of child project
margin will not necessarily add to the Parent Project Margin depending on
your setup, margin might be recalculated at Parent level. One example of
this would be if a child project is forecasting a Loss and the full value
of that loss is recognised in the current period, but at Parent level the
project as a whole is not forecasting a loss and therefore recognises
margin at the consolidated % cost completion. Something to look at.
Cheers
Andrew
*Andrew Tucker | **Sr Product Manager APAC*
*Trimble Viewpoint*
*D:* +61 2 9492 4100 | *C:* +61 416 209 722
Web | LinkedIn
| Twitter
Thanks Andrew; I found the movement margin is the info I need in the BFM report, but it turns out there are some issues with the report; some jobs are falling in and out of the report, while the sum of subprojects does not match the parent job margin, This issue means that the margin movement in the BFM report doesn���t match our GP.
I have raised a case for this and waiting to hear back.
Kind regards,
Julie Cooper | Finance Manager
Please note we have recently re-branded, formerly known as Sheldon Construction Services. A new name for an established business.
[cid:image001.png@01D8E215.DB8867D0]
02 9905 7777 | 0457 845 747
Unit 37/42 - 46 Wattle Road, Brookvale 2100 | www.jxbprojects.com.au
Disclaimer - This message and any attachments are confidential and may contain privileged information intended only for the use of the addressee named above.
If you are not the intended recipient of this message you are hereby notified that any use, dissemination, distribution or reproduction of this message is prohibited.
If you have received this message in error please notify JXB Projects immediately by return email.
Any views expressed in this message are those of the individual sender and may not necessarily reflect the views of JXB Projects.
Check your BFM Contract Reconciliation Reports as a first step.
There are a few BFM reports that list projects with Rev,turnover,cost,margin if you go through the BFM reports and More Reports menu options.
Check these for starters and if you need more help or something specificly designed for you we can help you through the case.
Cheers
Andrew
Andrew,
Can you not just show me the path of the report?
I have gone through all the searches and with Rick and we believe there no such report exists in jobpac
Absolutely we have reports such as this already.
Please log a support case and we will advise.
Thanks
Manjur
ANDREW TUCKER Sr. Product Manager APAC